Should you be interest in Troubleshooting and Maintaining Cisco IP Networks (TSHOOT), then the 300-135 study guides Cisco official certifications would likely acquire you to definitely the following higher-level. Testking Cisco free question provides 79 Q&As for ones analyze. A bring up to date time period will be September 02nd,2016, Testking provides least expensive amount for any CCNP 300-135 study guides.
Look at the 300-135 study guides details below:Most up-to-date 300-135 Simple Questions Latest Practice Test Questions VCE PDF Dumps
Qustion No. 1
- (Topic 19)
The implementation group has been using the test bed to do an IPv6 'proof-of-concept1. After several changes to the network addressing and routing schemes, a trouble ticket has been opened indicating that the loopback address on R1 (2026::111:1) is not able to ping the loopback address on DSW2 (2026::102:1).
Use the supported commands to isolate the cause of this fault and answer the following question.
The fault condition is related to which technology?
A. NTP
B. IPv4 OSPF Routing
C. IPv6 OSPF Routing
D. IPv4 layer 3 security
Answer: C
Explanation:
Since we are unable to ping the IPv6 address, the problem is with IPv6 OSPF Routing.
Qustion No. 2
- (Topic 1)
Which three features are benefits of using GRE tunnels in conjunction with IPsec for building siteto-site VPNs? (Choose three.)
A. allows dynamic routing over the tunnel
B. supports multi-protocol (non-IP) traffic over the tunnel
C. reduces IPsec headers overhead since tunnel mode is used
D. simplifies the ACL used in the crypto map
E. uses Virtual Tunnel Interface (VTI) to simplify the IPsec VPN configuration
Answer: A,B,D
Qustion No. 3
- (Topic 15)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.
65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.Use the supported commands to isolated the cause of this fault and answer the following questions.
On which device is the fault condition located?
A. R1
B. R2
C. R3
D. R4
E. DSW1
F. DSW2
G. ASW1
H. ASW2
Answer: E
Explanation:
On DSW1, VALN ACL, Need to delete the VLAN access-map test1 whose action is to drop access-list 10; specifically 10.2.1.3
Topic 16, Ticket 11 : IPV6 OSPF
Topology Overview (Actual Troubleshooting lab design is for below network design)
. Client Should have IP 10.2.1.3
. EIGRP 100 is running between switch DSW1 & DSW2
. OSPF (Process ID 1) is running between R1, R2, R3, R4
. Network of OSPF is redistributed in EIGRP
. BGP 65001 is configured on R1 with Webserver cloud AS 65002
. HSRP is running between DSW1 & DSW2 Switches
The company has created the test bed shown in the layer 2 and layer 3 topology exhibits.
This network consists of four routers, two layer 3 switches and two layer 2 switches.
In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.
DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.
R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISP's network. Because the company's address space is in the private range.
R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.
ASW1 and ASW2 are layer 2 switches.
NTP is enabled on all devices with 209.65.200.226 serving as the master clock source.
The client workstations receive their IP address and default gateway via R4's DHCP server.
The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.
In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.
DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.
The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.
Recently the implementation group has been using the test bed to do a ‘proof-of-concept' on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.
Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.
Each ticket has 3 sub questions that need to be answered & topology remains same.
Question-1 Fault is found on which device,
Question-2 Fault condition is related to,
Question-3 What exact problem is seen & what needs to be done for solution
Solution
Steps need to follow as below:-
. When we check on client 1 & Client 2 desktop we are not receiving DHCP address from R4
ipconfig ----- Client will be receiving IP address 10.2.1.3
. From Client PC we can ping 10.2.1.254….
. But IP 10.2.1.3 is able to ping from R4, R3, R2, R1.
. Since the problem is R1 (2026::111:1) is not able to ping loopback of DSW1 (2026::102:1).
. Kindly check for neighbourship of routers as IPV6…. As per design below neighbourship should be present for IPV6
R1 ---R2 --- R3 --- R4--- DSW1 & DSW2 ----- Neighbourship between devices of IPV6
R2 IPV6 OSPF neighbourship is with R1
R3 IPV6 OSPF neighbourship is with R4
. As per above snapshot we cannot see IPV6 neighbourship between R2 & R3 when checked interface configuration ipv6 ospf area 0 is missing on R2 which is connected to R3
. Change required: On R2, IPV6 OSPF routing, Configuration is required to add ipv6 ospf 6 area 0 under interface serial 0/0/0.23
Qustion No. 4
- (Topic 8)
The implementations group has been using the test bed to do a ‘proof-of-concept' that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.
Use the supported commands to isolated the cause of this fault and answer the following questions.
What is the solution to the fault condition?
A. Enable OSPF authentication on the s0/0/0 interface using the ip ospf authentication message-digest command
B. Enable OSPF routing on the s0/0/0 interface using the network 10.1.1.0 0.0.0.255 area 12 command.
C. Enable OSPF routing on the s0/0/0 interface using the network 209.65.200.0 0.0.0.255 area 12 command.
D. Redistribute the BGP route into OSPF using the redistribute BGP 65001 subnet command.
Answer: A
Explanation:
On R1, for IPV4 authentication of OSPF the command is missing and required to configure------ ip ospf authentication message-digest
Topic 9, Ticket 4 : BGP Neighbor
Topology Overview (Actual Troubleshooting lab design is for below network design)
. Client Should have IP 10.2.1.3
. EIGRP 100 is running between switch DSW1 & DSW2
. OSPF (Process ID 1) is running between R1, R2, R3, R4
. Network of OSPF is redistributed in EIGRP
. BGP 65001 is configured on R1 with Webserver cloud AS 65002
. HSRP is running between DSW1 & DSW2 Switches
The company has created the test bed shown in the layer 2 and layer 3 topology exhibits.
This network consists of four routers, two layer 3 switches and two layer 2 switches.
In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.
DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.
R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISP's network. Because the company's address space is in the private range.
R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.
ASW1 and ASW2 are layer 2 switches.
NTP is enabled on all devices with 209.65.200.226 serving as the master clock source.
The client workstations receive their IP address and default gateway via R4's DHCP server.
The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is running on DSW1 and DSW2.
In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.
DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.
The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.
Recently the implementation group has been using the test bed to do a ‘proof-of-concept' on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.
Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.
Each ticket has 3 sub questions that need to be answered & topology remains same.
Question-1 Fault is found on which device,
Question-2 Fault condition is related to,
Question-3 What exact problem is seen & what needs to be done for solution
Client is unable to ping IP 209.65.200.241
Solution
Steps need to follow as below:-
. When we check on client 1 & Client 2 desktop we are not receiving DHCP address from R4
ipconfig ----- Client will be receiving IP address 10.2.1.3
. IP 10.2.1.3 will be able to ping from R4 , R3, R2, R1
. Look for BGP Neighbourship
Sh ip bgp summary ----- No O/P will be seen
. Check for interface IP & ping IP 209.65.200.225 ---- Reply will be received from Webserver interface
. Look for peering IP address via sh run on R1 interface serial 0/0/1
. Since we are receiving icmp packets from Webserver interface on R1 so peering IP address under router BGP is configured wrong IP but with correct AS nos.
. Change required: On R1 under router BGP Change neighbor 209.56.200.226 remote-as 65002 statement to neighbor 209.65.200.226 remote-as 65002
Qustion No. 5
- (Topic 21)
The implementation group has been using the test bed to do an IPv6 'proof-of-concept1. After several changes to the network addressing and routing schemes, a trouble ticket has been opened indicating that the loopback address on R1 (2026::111:1) is not able to ping the loopback address on DSW2 (2026::102:1).
Use the supported commands to isolate the cause of this fault and answer the following question.
What is the solution to the fault condition?
A. Under the interface Tunnel34 configuration delete the tunnel mode ipv6 command.
B. Under the interface Serial0/0/0.34 configuration enter the ipv6 address 2026::34:1/122 command.
C. Under the interface Tunnel34 configuration enter the ip address unnumbered Serial0/0/0.34 command.
D. Under the interface Tunnel34 configuration delete the tunnel source Serial0/0/0.34 command and enter the tunnel source 2026::34:1/122 command.
Answer: A
Explanation:
As explained earlier, the problem is with route misconfigured tunnel modes on R3. R3 is using tunnel mode ipv6, while R4 is using the default of GRE. We need to remove the "tunnel mode ipv6" command under interface Tunnel34
Several online shops are providing groundwork materials with regard to Cisco examination 300-135 brain dumps. That is invaluable for any job hopefuls who wish to obvious Cisco examination and also end up being specialist within their arena. A Cisco 300-135 study guides apply examination may be the best that will guarantees the achievements selection with very first try out. Practicing any official certifications involving CCNP allows you for any individual to carry out the legal while using legitimate examination.